This project is our first completed family house from construction to finished interior.
Clients came to us just before the construction.
At the initial meeting, we raised the issue of light construction modifications, which helped us to have a better concept of the interior.
We changed the layout of the bedrooms on the 2nd floor and on the 1st floor we slightly moved the partition for the future kitchen and adjusted the heights of the window sills to match the future height of the kitchen worktop.
Compared to the original project, we also adjusted the overall layout of the living room with the kitchen and widened the doorway, which had a smaller passage and the door in it should have been sliding. But we wanted to maximize the entire opening and achieve a symmetrical passage with a revolving door.
We were given the task of designing a bright interior. Clients liked the modern and Scandinavian style interiors.
We have prepared 3 introductory proposals to help us clarify the way for their future home.
In the end, the mix of these 2 styles won... The dominating contrast was the color black.
The implementation took over 2 years. We worked here with a high standard of materials, elements and details.
We used the imitation of concrete finish design in toilets, bathroom, living room and kitchen. We also applied the same finish on to the furniture near the library in the dining room, or in the bathroom or on the toilets...
In the master bathroom, we had to invent a fairing for the laundry drop, which we could not place anywhere else due to the connection to the 1st floor. So optically, we hid it under the sink cabinet.
In the second half of the realization, the clients wanted to change the look of the staircase compared to the original project, which was not easy, as the concrete staircase in the house was already build. We had to modify and widen the steps to achieve the subtle continuity of the glass railing built into the thin iron side. But the result was worth it, and a more elegant staircase was created than with the originally full brick railing.
There is underfloor heating in the house, on which we laid vinyl flooring, which, apart from the main bathroom, is used in most rooms, including the staircase.
All furniture and glass doors were custom made. The furniture material was made of lacquer, solid wood, laminate, and the worktop is ceramic.
The biggest reference of this project for us is that after three months of living in their new home, the clients told us, no visitors want to leave because they feel very good and comfortable there.
We are very happy to achieve such a feeling in the interior we have created.